Sintavia HOLLYWOOD, FL

Gallery image Gallery image

Miller is handling construction of this two-story Class A structure and build-out of the administrative and manufacturing areas. This high-tech manufacturing facility is on track for spring 2019 delivery. Designed to streamline workflow for the vertically integrated manufacturer, the facility will maximize efficiency of product design, production, post-processing and testing with equipment including 3D metal printers, hot isostatic presses, vacuum furnaces, a metallurgical and mechanical lab, post-processing equipment and a CT scanner. Miller will assist in installing the equipment and is preparing the data drops that will feed high capacity 6000-amp electrical service throughout the company’s mission-critical network. Administrative spaces will feature imported tile in the lobby and elevator areas and other upscale finishes.

Project Details

Client: Apogee Investment Partners

Architect: FSMY

Size: 55,000 SF