Bridge Development Tenant Buildout Miami Gardens, FL
- UPS 3
- UPS 4
- UPS 2
- UPS 1
Miller’s preconstruction team saved the client significant time and costs before build-out began on this mission-critical facility for a global package delivery company. The project includes fast-tracking construction of a 90,435-sf mezzanine equipment platform within the 36-foot clear height space, and creating offices, customer service, locker and bathroom areas, plus a vehicle maintenance and wash complex. Close coordination is essential as the tenant’s specialty contractor installs a high-tech automated conveyor belt system from ground floor through mezzanine.
In reviewing drawings, Miller’s precon experts suggested a shorter plumbing run, which, as approved by the architect, saved costs for saw-cutting slab and trenching. Based on Miller’s proven performance in Miami Gardens, the team obtained City permission to begin construction while permitting was in review, to speed project delivery.