Miller Building Next-Generation Valero-Branded Gas Station

Valero NEWS
Traci Miller

Traci Miller

Senior VP Corporate Communications

Miller Construction is creating a sleek new Valero convenience store, car wash and fueling station at 1255 Palmetto Park Road for the owner operator, to replace an outdated service station.

The new operation will include a flex serve tunnel car wash offering express and detail packages plus unlimited plans.  The convenience store will offer made-to-order fresh food and drinks in addition to traditional convenience store products.  The fueling center will include a fast charging Level 3 electric charging station and ethanol-free gasoline in addition to standard unleaded fuel.

Scheduled for completion in May, the fast-tracked project on a site just east of I-95 includes demolishing an existing one-story building and reconfiguring the site, adding new underground storage tanks. The station’s 3,733-square-foot building will feature a ground-floor convenience store with attached 65-ft. tunnel car wash, plus a mezzanine office on the second floor. Designed by OA Architecture of Miami, the structure will have the upscale, contemporary look of an automotive dealership, from an exterior clad with aluminum composite panels, to the interior’s exposed steel beams and exposed concrete block.

Additional project team members include engineering firms Kimley-Horn Associates of Delray Beach (civil), CFS Engineering Group Inc. of Miami (structural) and L Triana & Associates of Miami (MEP).